1.    Hack floor & wall tiles.
2.    Provide waterproofing membrane underlayers with ponding test.
3.    Supply & lay selected floor tiles. (Max. area < 120 ft²)
4.    Supply & lay selected wall tiles to ceiling height. (Max. area < 250 ft²)
5.    Build cement bases for fridge, washing machine & kitchen cabinets.
6.    Provide inlet, embedded drainage pipe & anti pest floor trap.
7.    Install cabinet with fire-resistant post formed tabletop. (Max 20ft)
8.    Reinstate existing electrical socket points, wiring, switches&lightning.
9.    Haulage, debris removal & permit.
10.  Chemical acid washing & cleaning.
11.  Painting work ceiling & partial wall.
12.  Free! 2 bowls stainless steel sink & side level tap (While stocks last!)