 |
1. Hack floor & wall tiles.
2. Provide waterproofing membrane underlayers with ponding test.
3. Supply & lay selected floor tiles. (Max. area < 120 ft²)
4. Supply & lay selected wall tiles to ceiling height. (Max. area < 250 ft²)
5. Build cement bases for fridge, washing machine & kitchen cabinets.
6. Provide inlet, embedded drainage pipe & anti pest floor trap.
7. Install cabinet with fire-resistant post formed tabletop. (Max 20ft)
8. Reinstate existing electrical socket points, wiring, switches&lightning.
9. Haulage, debris removal & permit.
10. Chemical acid washing & cleaning.
11. Painting work ceiling & partial wall.
12. Free! 2 bowls stainless steel sink & side level tap (While stocks last!) |
 |
 |
 |